The film track — programmes, projects and the recurring, under the mandate of the “Montage Parallèle” squad. On what these three words cover, see how this site works.
The film activity carried out with Claude: a public site of critiques and studies, 46 analyses published, 61 pages published in total.
PRG
Programmes — the durable frameworks that govern the work
-
Site v2 contract
In force / in placeThe set of verifiable requirements every page of the site must meet.
As of 10 August 2026
-
AI collaboration charter
In force / in placeThe rules of collaboration between the squad and its AI capabilities: explicit mandates, human gates, instrument-read timestamps.
As of 10 August 2026
-
Provenance and attribution
In force / in placeSeveral signature regimes; the producing model is never guessed at.
As of 10 August 2026
-
Closed vocabularies
In force / in placeThe register's categories are chosen from a list, never invented.
As of 10 August 2026
-
Studies track
In force / in placeA distinct regime under editorial supervision, outside the critique pipeline.
As of 10 August 2026
Projects
One-off pieces of work, open and closed
-
Site v2 switch-over
CompletedCorpus migration, full acceptance testing, self-hosted typography.
As of 10 August 2026
-
Method-repository alignment
CompletedThe analysis method brought up to date with the site (static lists).
As of 10 August 2026
-
Source research
CompletedPrivate source folders, wired in as an optional pipeline step.
As of 10 August 2026
-
Augmented critique
CompletedA conclusive prototype, reusable from one mandate to the next.
As of 10 August 2026
-
English-language site
CompletedThe /en/ tree is published, with language pairing and the sitemap kept current.
As of 5 August 2026
-
Certification of the overnight routine
On holdThe scheduled chain is waiting for its resumption gate.
As of 10 August 2026
RUN
The recurring — what runs with every publication or on a fixed interval
Analyses as they come
OngoingA queue picked up in turn, a versioned pipeline, one film at a time.
As of 10 August 2026
Pre-publication checks
In force / in placeA mechanical battery of checks replayed on push by the repository hook.
As of 10 August 2026
Mailbox pickup
In force / in placeRequests from the Dropbox mirror carried over into the queue.
As of 10 August 2026
Internal logs
In force / in placeAnalyses, access errors and image sources, all logged.
As of 10 August 2026
Overnight routine
On holdThe scheduled batches are suspended pending certification.
As of 10 August 2026